Drilling concrete diamond tool

Drilling concrete diamond tool

Drilling concrete diamond tool – a high-tech process that is often necessary for construction and repair work in the capital buildings. Use it to make a niche in the walls and ceilings , is drilling holes for the installation of utilities . The works in this must be done in accordance with building codes , limiting noise and vibration. No other method for these activities is not suitable. Also diamond drilling allows to work in essentially limited (up to 1 meter) space.

Work is performed using a diamond drill bits of various sizes , from 12 to 600 mm . The depth of the holes is not particularly limited, and may not exceed 3 meters. Drilling speed when working with a diamond tool is 2-5 cm \ min. , Far exceeding all other ways make the holes in the concrete structures. Diamond drill bit on the area far exceeds the area of ​​a conventional drill .

Drilling is performed with a minimum of dust and lack of strong noise. Vacuum equipment is provided with cleaning the dust in the process, and hydraulically to the cooling and flushing water. One hole in the concrete wall standard requires from 2 to 5 liters of water.

The use of diamond drill bits for drilling does not cause damage to the supporting structures , is not conducive to the emergence of micro-cracks in them . Thus making this method of treatment of the concrete is much safer than traditional methods .

In addition, a major advantage of diamond drill bits before  Boers is the ability to work with heterogeneous material. For example, concrete structures , reinforced with metal or rubble concrete , with lots of rubble as a placeholder. In the process of diamond drill holes are obtained with perfectly smooth edges that do not require them to further processing .

One diamond crown without replacement can perform drilling to a depth of 400 mm. If you want to drill a hole large diameter , 30 cm above , you must use equipment that runs at a voltage of 380 V. It should be noted that the process of drilling takes much less time and effort than the preparatory work on the layout of holes Water supply and secure access to treatment portion concrete structure.